Tonkin Highway Industrial Estate - Strategen Environmental
BRIDGE is a retina multi-purpose WordPress theme built on very powerful and flexible framework by QODE.
agency, ajax, background video, blog, business, clean, creative, fullscreen, mega menu, modern, multi-purpose, parallax, portfolio, responsive, retina
17394
post-template-default,single,single-post,postid-17394,single-format-standard,ajax_fade,page_not_loaded,,qode-child-theme-ver-1.0.0,qode-theme-ver-14.4,qode-theme-bridge,disabled_footer_bottom,wpb-js-composer js-comp-ver-5.4.7,vc_responsive
 

Tonkin Highway Industrial Estate

NEWS

Tonkin Highway Industrial Estate

Removing complexity to make growth and development happen.

Strategen wishes to congratulate Linc Property on the opening of the Tonkin Highway Industrial Estate (THIE) – one of Perth’s most exciting new industrial land opportunities.

Strategen is proud to have worked with Linc on this project. Our contaminated sites team have had a long and detailed involvement assisting the THIE come to fruition. The scope of services that Strategen provided for this project includes:

• soil and groundwater investigations

• Acid Sulfate Soil (ASS) investigations

• groundwater management

• preparation of site management plans, ASS investigation report, ASS and dewatering management plan, ASS Initial Closure Reports

• implementation of a comprehensive ASS and dewatering management program

• challenging drilling program (using Strataprobe) around a complex web of services including fibre optics, electrical, sub-surface drainage, sewer, stormwater, water

• providing environmental advice on the large-scale earthwork program and included deep trenching and deep horizontal drilling.

Strategen achieved auditor sign-off for three separate site management plans, and held consistent and comprehensive liaisons with DWER.