AFAC 2018 - Strategen Environmental
BRIDGE is a retina multi-purpose WordPress theme built on very powerful and flexible framework by QODE.
agency, ajax, background video, blog, business, clean, creative, fullscreen, mega menu, modern, multi-purpose, parallax, portfolio, responsive, retina
17629
post-template-default,single,single-post,postid-17629,single-format-standard,ajax_fade,page_not_loaded,,qode-child-theme-ver-1.0.0,qode-theme-ver-14.4,qode-theme-bridge,disabled_footer_bottom,wpb-js-composer js-comp-ver-5.4.7,vc_responsive
 

AFAC 2018

NEWS

AFAC 2018

Removing complexity to make growth and development happen.

Strategen wishes to congratulate Linc Property on the opening of the Tonkin Highway Industrial Estate (THIE) – one of Perth’s most exciting new industrial land opportunities.

Strategen is proud to have worked with Linc on this project. Our contaminated sites team have had a long and detailed involvement assisting the THIE come to fruition. The scope of services that Strategen provided for this project includes:

• soil and groundwater investigations

• Acid Sulfate Soil (ASS) investigations

• groundwater management

• preparation of site management plans, ASS investigation report, ASS and dewatering management plan, ASS Initial Closure Reports

• implementation of a comprehensive ASS and dewatering management program

• challenging drilling program (using Strataprobe) around a complex web of services including fibre optics, electrical, sub-surface drainage, sewer, stormwater, water

• providing environmental advice on the large-scale earthwork program and included deep trenching and deep horizontal drilling.

Strategen achieved auditor sign-off for three separate site management plans, and held consistent and comprehensive liaisons with DWER.